Victory Czech

Pressing

Technical documentation and drawings are processed using 3D CAD software. The production limit for pressed components is max. 3 months from contract conclusion (according to the complexity of the component). Profiles production can be started within 3 to 4 months after the contract conclusion.

Cold forming:

  • cutting, bending, drawing, etc.

Machinery:

  • hydraulické a výstředníkové lisy
  • od 25 tun do 160 tun

Parts:

  • tloušťky do 5 mm
  • šířky do 600 mm
  • délky do 1 000 mm

Product preview:


Holder with pressed screws
       

© 2008 Victory Czech s.r.o. | Design & Programming by Inspiration © 2008 - 2010
sfy39587f11